Publication Detail
The Phase One I-710 Freeway Rehabilitation Project: Initial Design (1999) to Performance after Five-Plus Years of Traffic (2009)
UCD-ITS-RR-09-47 Research Report Download PDF |
Suggested Citation:
Monismith, Carl L., John T. Harvey, Bor-Wen Tsai, Fenella Long, James Signore (2009) The Phase One I-710 Freeway Rehabilitation Project: Initial Design (1999) to Performance after Five-Plus Years of Traffic (2009) . Institute of Transportation Studies, University of California, Davis, Research Report UCD-ITS-RR-09-47
This summary report incorporates into a single document the design, construction, and performance data for the
I-710 Freeway Rehabilitation Project in Long Beach, California. Included are the following: summaries of the
asphalt mix and structural pavement section designs; construction sequence for a representative 55 hours closure;
design and construction experience from post construction interviews with Caltrans and Contractor Staff;
pavement performance evaluations in the period November 2003 and January 2009 (five-plus years under traffic),
as well as the results of additional analyses and tests on mixes obtained from cores and slabs taken from the
pavement after construction. This project is one of the first major freeway rehabilitation projects in the US
incorporating 55-hour weekend closures (a total of eight in this instance) for the construction of long-life asphalt
pavements. It includes both full-depth asphalt concrete sections, which replaced the existing portland cement
concrete (PCC) pavement under the over crossings and at interchanges, and asphalt concrete overlays on
cracked-and-seated PCC on the sections between the interchanges and over crossings.
Aspects of the project involved a Caltrans, Industry, and University cooperative effort—through the Flexible
Pavement Task Group the Long Life Pavement Rehabilitation Strategies (LLPRS) Program)—for both design
development and construction evaluations. The project utilized asphalt mix and structural pavement section
designs based on Strategic Highway Research Program (SHRP) developed technologies, results from the
California Accelerated Pavement Testing Program, and innovations in construction specifications and
requirements.
I-710 Freeway Rehabilitation Project in Long Beach, California. Included are the following: summaries of the
asphalt mix and structural pavement section designs; construction sequence for a representative 55 hours closure;
design and construction experience from post construction interviews with Caltrans and Contractor Staff;
pavement performance evaluations in the period November 2003 and January 2009 (five-plus years under traffic),
as well as the results of additional analyses and tests on mixes obtained from cores and slabs taken from the
pavement after construction. This project is one of the first major freeway rehabilitation projects in the US
incorporating 55-hour weekend closures (a total of eight in this instance) for the construction of long-life asphalt
pavements. It includes both full-depth asphalt concrete sections, which replaced the existing portland cement
concrete (PCC) pavement under the over crossings and at interchanges, and asphalt concrete overlays on
cracked-and-seated PCC on the sections between the interchanges and over crossings.
Aspects of the project involved a Caltrans, Industry, and University cooperative effort—through the Flexible
Pavement Task Group the Long Life Pavement Rehabilitation Strategies (LLPRS) Program)—for both design
development and construction evaluations. The project utilized asphalt mix and structural pavement section
designs based on Strategic Highway Research Program (SHRP) developed technologies, results from the
California Accelerated Pavement Testing Program, and innovations in construction specifications and
requirements.